Thursday, March 28, 2013

Steam Hood/Vent

Wow, it's been a while....finally picked the spot where I'm gonna set up. I reworked a work bench in the basement, lowering it, and installing the 4 prong receptacle to plug the control box into.

Then I made a hood to collect the 1-2 gallons of evaporation from the boil. I knocked a hole in the wall to vent it to the garage, right next to the smaller one that I use to send the beer from the chiller into the conical fermentor when I'm brewing in the garage.

I have to wait for the liquid nails to dry before I attempt to install the hood and connect it to the vent. Maybe tomorrow I can test it out!!!!!