Check out the pics.....I have all the parts, the box has been painted, and I'm getting it wired. I'll have to send the probe back, as I got it with metric threading instead of npt.
Ordered an aluminum mesh pizza tray that will fit perfectly into the bottom of the pot that I will use for my false bottom. Once I have that and the new npt probe I'll be ready to brew.....assuming all my wiring is correct and I don't fry myself!!!
Hey....I really like to make my own brewing equipment as well as my own beer. So if you're interested, this is what I have going on.
Showing posts with label biab. Show all posts
Showing posts with label biab. Show all posts
Saturday, February 9, 2013
Thursday, January 24, 2013
Control Box
The control box is coming along....just need a few more parts for the exterior....the master key switch and a red light to go with it, and the receptacle for the rtd (thermo coupler).
For the inside, I still need the 2 relays and all the wire and the incidentals to hook everything up.
Overall, the only things I need after that are the pump (and associated plumbing), the rtd and a false bottom to keep the mesh bag off of the heating element.
It's getting there, and I can't wait to brew with the new system!!
For the inside, I still need the 2 relays and all the wire and the incidentals to hook everything up.
Overall, the only things I need after that are the pump (and associated plumbing), the rtd and a false bottom to keep the mesh bag off of the heating element.
It's getting there, and I can't wait to brew with the new system!!
Subscribe to:
Posts (Atom)








