I felt that I needed a little more control and info during brewing, so I cut a couple more holes in the control box to accommodate another RTD connection, another PID, and a buzzer with a switch. It was pretty cool that just as I got done cutting out the square for the PID the mail arrived, and in the mail was the new PID!!
Now I just have to wait for the switch and buzzer to arrive, unfortunately they are coming from china so it may be another week or two.
Some other upgrades include another pump which will serve to recirculate the liquid inside the HLT/brew pot to keep temps even and aid in whirl pooling during the cooling process. I also need to install the RTD probe into the pot. So that means another 3 holes in the brew pot!! That will make 6. I haven't done that yet so pics of that later.
Once done, I'll be able to brew another batch with or without the buzzer and switch.
That's it for now
Ed
Hey....I really like to make my own brewing equipment as well as my own beer. So if you're interested, this is what I have going on.
Showing posts with label Brewing. Show all posts
Showing posts with label Brewing. Show all posts
Thursday, April 18, 2013
Saturday, February 9, 2013
More Work Done on the Control Box
Check out the pics.....I have all the parts, the box has been painted, and I'm getting it wired. I'll have to send the probe back, as I got it with metric threading instead of npt.
Ordered an aluminum mesh pizza tray that will fit perfectly into the bottom of the pot that I will use for my false bottom. Once I have that and the new npt probe I'll be ready to brew.....assuming all my wiring is correct and I don't fry myself!!!
Ordered an aluminum mesh pizza tray that will fit perfectly into the bottom of the pot that I will use for my false bottom. Once I have that and the new npt probe I'll be ready to brew.....assuming all my wiring is correct and I don't fry myself!!!
Thursday, January 24, 2013
Control Box
The control box is coming along....just need a few more parts for the exterior....the master key switch and a red light to go with it, and the receptacle for the rtd (thermo coupler).
For the inside, I still need the 2 relays and all the wire and the incidentals to hook everything up.
Overall, the only things I need after that are the pump (and associated plumbing), the rtd and a false bottom to keep the mesh bag off of the heating element.
It's getting there, and I can't wait to brew with the new system!!
For the inside, I still need the 2 relays and all the wire and the incidentals to hook everything up.
Overall, the only things I need after that are the pump (and associated plumbing), the rtd and a false bottom to keep the mesh bag off of the heating element.
It's getting there, and I can't wait to brew with the new system!!